The Regulation on Renewable Energies Power Plants
Medium / Small Scale Power Plants
Procurement Procedure
- Ministerial regulation No 01/2006 on Procedure for Electric Power Purchase for Public Consumption
- Ministerial Regulation No 2/2006 on Medium Scale Renewable Energies Based Power Plants
- Ministerial decree No 1122/2002 on Scattered–Small Scale Scattered Power Plants
- PKUK (Pemegang Kuasa Usaha Ketenagalistrikan = Holder of Attorney for Electrical Business) or PLN may purchase electricity from PIUKU/IPP by Tender or-by Direct Appointment (01/2006)
- For Scattered Project Procurement for Small Scale Scattered Power Plants can be done by Direct Appointment (1122/2002)
(2). Excess Power Maximum Capacity of 1 MW
- For Renewable Energy based Power Plants can be by Direct Appointment (01/2006 and 02/2006) :
(2). Excess Power between 1 MW to 10 MW
- Interested Parties may submit proposal (administrative and technical) to PLN with copies to Directorate General, Governor or Mayor of the Area (02/2006; 1122/2002)
- For Renewable Energy based Power Plants (as per 02/2006), Interested Parties can be : Joint Ventures, Privates, BUMD, Individual.
- For Small Scale Scattered Power Plants; interested parties should be Small Business/Small Scale Privates Company/ Joint Ventures.
The Regulation on Renewable Energies Power Plants Small / Medium Scale Power Plants
Tender Procedure
Tender Procedure
- Privates or Ventures interested must obtained License for Electrical Business for Public Consumption (fixed IUKU) (01/2006).
- For Medium Scale Minimum Term of Contract: 10 years (02/2006).
- Construction can only be started after the license (fixed IUKU) is obtained (02/2006)
- In carrying out the Project, Developers shall use / utilize domestic product/ services (02/2006).
- Power Plants can be operated after obtaining Commissioning Certificate from authority decided by Government (02/2006)
- For Small Scale Scattered Power Plants, Privates or Ventures interested must also obtained License for Electrical Business for Small Scale Scattered Power Plants (IUK PSK) (1122/2002).
- The License is given after Privates obtaining the Commissioning Certificate (1122/2002)
Note : - PKUK = Pemegang Kuasa Usaha Ketenagalistrikan (Holder of Attorney for Electrical Business ) - PIUKU = Pemegang Izin Usaha Ketenagalistrikan untuk Kepentingan Umum (Holder of License for Electrical Business for Public Consumpsion) file : Arief Budiardjo